-
leveled many pads and maintained/repaired park roads
-
added brick retaining walls to some pads (for leveling and support)
-
created a lighted dog walk around the park and added 'pickup' bag dispenser
-
installed a horseshoe pitching pit
-
added state flags for color in front of park
-
added 'overflow' pads with water/electrical
-
converted some tent spots to water/electric spots for our smaller camping vehicles
-
added 5 planting tubs with perennials in front of store
-
widened our entrance by 2X to make it easier to enter/depart
-
sealed and patched our asphalt driveway to make it last longer
-
installed new heavy duty attractive log fence around part of park (and stained it)
-
converted 8 additional pads to 50 Amps from 30 Amps
-
doubled our power supply for washer/dryer/store and front Pads to 400AMPS
-
added additional sewer ports per pad to allow for both motorhomes & 5th wheels
-
added a generator to run our water pump in case our power fails (rarely does)
-
painted and sealed our deck (this is done every year)
-
painted the bathrooms
-
replaced wooden picnic tables with sturdy hard rubber tables
-
acquired 6 additional acres for future expansion
-
added Wi-Fi for free internet access
-
added extensively to our Web page for visitor services/directory and interactive trail maps and descriptions plus hundreds of photos in our gallery.